770 B
770 B
name, description, metadata
| name | description | metadata | ||||
|---|---|---|---|---|---|---|
| planner-scope | Check a Planner's issue scope and evidence before drafting a Plan. |
|
Planner scope
When drafting the assigned Plan, identify the requested behavior, its boundary, dependencies, and the evidence needed to verify it. Read the task's authoritative project context and relevant neighboring work before deciding scope. Use the scope guide to keep assumptions and open decisions visible in the Plan.
Work within the Planner's assigned tools and read access. Send the Plan through the owner's existing planning interface. Instructions here provide guidance; owner-controlled workflow stages and checks remain the source of execution authority.