planner-scope (schema 2, issueClaim unchanged) now translates the Specification Designer's requested proof, fast-test completeness, and declared test resources into Implementer fast checks and Building Inspector verification goals in Plan v1. A new escalation.md resolves Implementer needs_operator_decision and scope_exceeded flags inside the approved specification or promotes them, and escalates directly with one typed Layer C reason and a short risk summary, never downgrading operator_review_required. code-review-auto and code-review share a Trust Pyramid "Propose a guardrail" section (architecture/API boundary, then static check or fast regression test, then verification harness, then a candidate prose skill as last resort) and a typed "Escalate" section. planner-communication and reviewer-communication (schema 3) frame escalations and Review Packets. RELEASE-NOTES.md gives each package's before and after for fork maintainers; OVERRIDING.md and README.md record the new versions and seams. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
32 lines
3.0 KiB
Markdown
32 lines
3.0 KiB
Markdown
# Escalation guide
|
|
|
|
Operator attention is the scarcest resource in the workflow. Escalate only what changes the Operator's intent or risk, and settle everything else inside the approved specification.
|
|
|
|
## Triage Implementer flags
|
|
|
|
The Implementer does not page the Operator directly. It reports `needs_operator_decision` when it meets an ambiguity, sensitive boundary, or tradeoff it cannot settle, and `scope_exceeded` when the work appears to need more than the Plan allows. For each flag:
|
|
|
|
1. Reread the specification, the Plan, and the evidence the Implementer cited.
|
|
2. **Resolve it** when the answer is strictly inside the approved specification: the specification, its acceptance criteria, or a documented project contract already settles it, or a choice changes neither user-visible behavior nor risk. Answer the Implementer with the decision and the clause or contract that supports it, and update the Plan if the answer changes a step.
|
|
3. **Promote it** to a typed escalation when the answer would change what the Operator asked for or the risk they accepted. Name the flag you promoted in the risk summary.
|
|
|
|
Never resolve a flag by quietly narrowing the requested proof, dropping an acceptance observation, or widening the scope.
|
|
|
|
## Escalate directly
|
|
|
|
Escalate with exactly one typed reason and a risk summary of one or two sentences that names the decision the Operator must make and the evidence behind it:
|
|
|
|
- `boundary_crossed`: the work needs a sensitive boundary the specification did not approve, such as a public contract or API, a schema migration, authentication or security, CI or release configuration, a user-facing screen, or a new dependency, network egress, secret, or privilege.
|
|
- `spec_ambiguity`: the specification supports two materially different behaviors and no contract settles which one the Operator wants.
|
|
- `verification_incomplete`: the requested proof cannot be met as planned, for example because an acceptance observation cannot be covered by fast deterministic tests although the specification marked it `complete`.
|
|
- `behavioral_tradeoff`: meeting the specification needs a visible compromise or architectural tradeoff the specification did not settle.
|
|
- `convergence_exceeded`: correction rounds with the Implementer keep failing on the same findings, and another round is unlikely to converge.
|
|
|
|
Raise it through the escalation interface the owner assigns. Where none is assigned, state the reason and risk summary as an open decision in the Plan or your review result, so the Operator sees it without reading the conversation.
|
|
|
|
## Discipline
|
|
|
|
- Escalate only with a reason and evidence. A vague escalation made just to be safe spends Operator attention without telling them what to decide.
|
|
- An escalation only raises the review a task needs: never downgrade `operator_review_required`, ask the owner to lower a review tier, or argue that a stamped specification needs less review.
|
|
- One escalation per decision. Add new evidence to the existing escalation rather than raising the same decision again.
|