- The guardrail trigger no longer presupposes a deterministic check, so a genuine judgment call can reach the candidate prose skill rung; rung 4 proposes a candidate skill diff, and a check asks whether a lower rung would catch the class. Both review packages' Escalate sections are now pinned identical too. - planner-scope turns verification goals into manual Operator checks when no Tester step will run, and triages Implementer flags only once the Implementer reports one. - reviewer-communication uses Specification Designer terminology. - Release notes cover the planner-scope SKILL.md change; README keeps "optional" for code-review-auto. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
4.6 KiB
Release notes
What changed in each release's packages, for Operators who maintain a fork of
one. Compare your fork with the package at the new tag, and carry over the
changes you want. A fork keeps its own source identity and is never
replaced by a bundled update. OVERRIDING.md lists every
package's current version and release.
v0.16.0 (not yet tagged)
Planner and Reviewer guidance for RelayView's proposed tiered review: the Planner turns the Specification Designer's requested proof into checks, triages Implementer flags, and escalates with typed reasons; the Reviewer proposes Trust Pyramid guardrails. Owner rules for typed escalation and Guardrail Proposal cards are proposed in RelayView and not yet shipped, so the packages fall back to stating an escalation in the Plan or review result when no escalation interface is assigned. No schema, role, or step changes; every earlier release keeps its bytes.
planner-scope
- Before (0.13.0): scope analysis and a structured Plan shape (
scope.md) with no proof or escalation guidance. - After:
SKILL.mdadds sections on translating proof into Plan v1, on triage and escalation, and a readiness check that each requested proof artifact maps to a fast check, a verification goal, or a remaining manual Operator check.scope.mdadds "Translate requested proof": each requested proof artifact, fast-test completeness value, and declared test resource becomes an Implementer fast check, a Building Inspector verification goal, or a remaining manual Operator check (verification goals become manual checks when no Tester step will run), and the Plan shape gainsfast_checks,verification_goals, andmanual_operator_checks. A newescalation.mdresolves an Implementerneeds_operator_decisionorscope_exceededflag, once the Implementer reports one, when the answer is strictly inside the approved specification, promotes it otherwise, and escalates directly with one typed reason (boundary_crossed,spec_ambiguity,verification_incomplete,behavioral_tradeoff,convergence_exceeded) and a short risk summary, never just to be safe and never downgradingoperator_review_required. The description names the new scope. - Fork: schema 2 and
issueClaim: status/in-progressare unchanged. A fork that wants the new behavior addsescalation.mdto its directory and its sidecarfiles, and recalculates the digests.
planner-communication
- Before (0.14.0): direct address, proportional detail, Markdown, acknowledgements, and pre-finalization discussion.
- After: adds one paragraph: call the specification's author the Specification Designer, lead an escalation with its typed reason and risk summary, and report a flag settled inside the specification as a decision rather than a question.
- Fork: schema 3 and
communication_contextare unchanged.
code-review-auto
- Before (0.13.0): one line asking for bounded, path-aware, actionable findings.
- After: each finding names its file and line, evidence, and requested
change. New "Propose a guardrail" and "Escalate" sections, identical to
code-review's: propose the lowest viable Trust Pyramid rung for a repeatable defect class (architecture or API boundary, static check or lint rule with a root-cause message or fast regression test, verification harness or Feature Map update, then a candidate prose skill as the last resort, active only after the Operator approves it), with a follow-up task for rungs 1 to 3 or a candidate skill diff for rung 4, and escalate with one typed reason and a risk summary. The display name becomes "Review findings and guardrails" and the description names the new scope. - Fork: schema 1 is unchanged. The package still leaves two-axis
inspection to the manual
code-review.
code-review
- Before (0.13.0): manual two-axis standards and Plan-fidelity review.
- After: the same review, plus the "Propose a guardrail" and "Escalate"
sections shared with
code-review-auto. The description names the new scope. - Fork: schema 1 and manual mode are unchanged.
reviewer-communication
- Before (0.13.0): proportional detail, Markdown, acknowledgements, and finding explanation.
- After: adds one paragraph: Specification Designer naming, and Review Packet framing with the escalation's typed reason and risk summary first, then findings by severity, then any Guardrail Proposal presented as a recommendation rather than a blocker, and no cautionary escalation when nothing needs the Operator.
- Fork: schema 3 and
communication_contextare unchanged.