Teach planner-scope the owner issue-claim handoff
Check instruction packages / check (push) Successful in 3s
Check instruction packages / check (pull_request) Successful in 3s

This commit is contained in:
admin committed 2026-10-12 09:26:21 -04:00
1 parent ea94dc877e
commit 09f70fd203
4 files changed
+7 -5

No files matched your search

+1 -1
View File
@@ -6,7 +6,7 @@ Public source for RelayView-maintained instruction-only role skills and an illus
| Directory | Status | Role / step | Version |
| --- | --- | --- | --- |
| `packages/planner-scope` | Maintained default | Planner / planning | 0.2.0 |
| `packages/planner-scope` | Maintained default | Planner / planning | 0.3.0 |
| `packages/implementer-handoff` | Maintained default | Implementer / implementation | 0.2.0 |
| `packages/codebase-design` | Optional guidance | Planner / planning | 0.3.0 |
| `packages/grill-me` | Optional guidance | Planner / planning | 0.3.0 |
+3 -1
View File
@@ -3,7 +3,7 @@ name: planner-scope
description: Check assigned issue scope, neighboring work, and verification before drafting a Plan.
metadata:
relayview-display-name: Planner scope
relayview-version: 0.2.0
relayview-version: 0.3.0
---
# Planner scope
@@ -13,3 +13,5 @@ When drafting the assigned Plan, identify the requested behavior, its boundary,
If the owner supplies an admitted work-item identity, use the assigned read tools to inspect it. Preserve source attribution; an issue description is a request, not evidence that its proposed behavior exists. Where tracker access is unavailable, state the missing context instead of guessing a work-item identity.
Write the Plan through the owner's assigned planning interface. The Plan is ready when each requested outcome has an implementation boundary and a checkable success or recovery observation. Owner-controlled workflow stages and checks determine execution authority.
For a linked Gitea issue, the default claim is the owner's transition from `status/ready-for-agent` to `status/in-progress` after it proves that the exact Plan reached the Implementer. Finalize the Plan through the assigned interface, then use owner-reported handoff and issue-claim outcomes when explaining progress to the Human. An accepted Plan alone does not establish that claim. The operator may disable or replace the status transition through owner policy; follow the effective policy recorded for the task.
+2 -2
View File
@@ -2,14 +2,14 @@
"schemaVersion": 1,
"source": {
"kind": "first-party",
"reference": "v0.2.0"
"reference": "v0.4.0"
},
"role": "planner",
"step": "planning",
"files": [
{
"path": "SKILL.md",
"sha256": "31399ba322d8a4d3ed9814e7fd5d54883b4773c5b7dc3a241b8e14f8f7c16072"
"sha256": "bfac8352adffa8e2aaa246a6b5f11a333045a82aeefe5d0e42e76eaa776a6a70"
},
{
"path": "scope.md",
+1 -1
View File
@@ -65,7 +65,7 @@ class PackageTests(unittest.TestCase):
package = ROOT / "packages" / name
manifest = json.loads((package / "relayview-skill.json").read_text())
self.assertEqual((manifest["role"], manifest["step"]), (role, step))
self.assertEqual(manifest["source"], {"kind": "first-party", "reference": "v0.2.0"})
self.assertEqual(manifest["source"], {"kind": "first-party", "reference": "v0.4.0" if name == "planner-scope" else "v0.2.0"})
self.assertIn(resource, [item["path"] for item in manifest["files"]])
self.assertIn(marker, (package / "SKILL.md").read_text() + (package / resource).read_text())