Files
relayview-skills/packages/planner-scope/SKILL.md
T
admin 370ebd572f
Check instruction packages / check (push) Successful in 3s
Check instruction packages / check (pull_request) Successful in 3s
Publish planner and implementer role guidance v0.2.0
2026-10-05 15:20:12 -04:00

1.1 KiB

name, description, metadata
name description metadata
planner-scope Check assigned issue scope, neighboring work, and verification before drafting a Plan.
relayview-display-name relayview-version
Planner scope 0.2.0

Planner scope

When drafting the assigned Plan, identify the requested behavior, its boundary, dependencies, and the evidence needed to verify it. Read the task's authoritative project context, corresponding code and tests, and relevant neighboring work before deciding scope. Use the scope guide to keep assumptions and open decisions visible in the Plan.

If the owner supplies an admitted work-item identity, use the assigned read tools to inspect it. Preserve source attribution; an issue description is a request, not evidence that its proposed behavior exists. Where tracker access is unavailable, state the missing context instead of guessing a work-item identity.

Write the Plan through the owner's assigned planning interface. The Plan is ready when each requested outcome has an implementation boundary and a checkable success or recovery observation. Owner-controlled workflow stages and checks determine execution authority.