Files
relayview-skills/packages/implementer-handoff/SKILL.md
T
adminandClaude Opus 5.5 b217bfcb03 Address review: keep sealing as guidance and the rules in handoff.md
Move the fast-check definition and flag triggers out of implementer-handoff's
SKILL.md so forking handoff.md alone changes them, as OVERRIDING.md says.
Reword sealing as an aim the owner's workflow decides rather than a gate the
prose restates, so a fast check that can never pass ends in a report. Raise
scope_exceeded for a failing check only when the fix leaves the Plan.
Rewrap the release-notes intro and rename one test.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 23:29:30 -05:00

2.3 KiB

name, description, metadata
name description metadata
implementer-handoff Converge fast checks before sealing a candidate, route uncertainty and scope flags to the Planner, reconcile verified documentation, and prepare review content during implementation.
relayview-display-name relayview-version
Implementer handoff 0.16.0

Implementer handoff

During the assigned implementation step, keep the repository's current-behavior documentation aligned with the code and checks you actually completed. Read the project's documentation rules and the relevant existing contract before editing it. Use the handoff guide for the inner loop, flags to the Planner, clarification, documentation disposition and review content.

Converge before sealing

Work in a tight inner loop with the Planner, as the handoff guide describes: after each change, run the Plan's Implementer fast checks, and iterate until they pass and the Planner feedback is resolved, before sealing a candidate. The Building Inspector's runtime verification is slow and scarce; it should find what fast checks cannot, not what they would have caught.

Flag instead of escalating

When a question needs a decision that the specification, the Plan, and the project's contracts do not settle, raise a needs_operator_decision or scope_exceeded flag to the Planner as the handoff guide describes, rather than escalating to the Operator yourself. The Planner settles the flag inside the approved specification or escalates it.

Hand off

Prepare a concise, attributable review handoff when the assigned workflow gives you a place to submit one. Identify the exact candidate, the fast checks and their observed results on it, declared test resource readiness and known gaps, any manual evidence and its observer, open flags, unresolved limitations, and the documentation disposition. A command attempted is not a check passed; report failures and stale evidence explicitly.

Use only the Implementer's assigned tools and owner interfaces. The owner verifies validation, review, provider effects, and stage readiness; your prose is a report for that process. This step is complete when documentation describes verified behavior and the handoff states the fast-check results on the exact candidate you seal and lets a reviewer reproduce the relevant checks.