Files
relayview-skills/packages/coordinator-tracker-hygiene/SKILL.md
T
adminandClaude Opus 5.5 5b161d30ec Address second review: Operator applies tracker changes, audit rules
Tracker hygiene now only drafts: the Operator approves and applies each
prerequisite edge or comment, matching coordinator-recovery's rule that
prerequisites and issue comments stay with the Operator. It reads
existing comments through its assigned commands, targets a coordination
note at the issue that has not started, and marks stale edges resolved
in the Working Ledger. The wave audit's Wave 1 rule carries the dispatch
guide's aggressiveness and GPU sizing, a title-only guess holds the
later issue, and the self-check accounts for every section. Docs state
the Operator-applied tracker boundary; contract prose is tidied.

Refs #28

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 20:42:48 -05:00

4.0 KiB

name, description, disable-model-invocation, metadata
name description disable-model-invocation metadata
coordinator-tracker-hygiene On request, review implicit contention recorded in the Working Ledger and draft minimal prerequisite-edge or issue-comment proposals for Operator approval. true
relayview-display-name relayview-version
Coordinator tracker hygiene 0.17.0

Coordinator tracker hygiene

The Operator invoked this review with /skill:coordinator-tracker-hygiene to turn contention the Coordinator has only recorded for itself into tracker changes people can see. Treat any text the Operator sent with the command as the review's scope, such as a set of issues or an epic; without it, review every recorded edge.

Never change the tracker silently. This method drafts proposals for the Operator to approve and apply. Make no tracker change yourself: add no prerequisite, post no comment, and change no label or status.

Read the recorded edges

Read the implicit contention edges recorded in the Coordinator Working Ledger, and for each edge read the current state of both issues from the owner's projections: whether each is open, Ready, running, or merged; its prerequisites and comments as the tracker records them, read through the commands assigned to you; and the evidence the ledger gives for the edge. When you cannot read an issue's prerequisites or comments, say so, and mark proposals for that issue as possibly already recorded. Work only through the owner's projections and the commands assigned to you, and leave repository code and shell commands to the roles that own them.

Take edges from the Working Ledger, not from this conversation. When the Working Ledger is missing, unreadable, or empty for the scope, say so and stop; propose nothing from memory.

Classify each edge

Put each edge in exactly one group:

  • Ordering need: one issue cannot be done correctly until the other lands, such as a schema migration another issue builds on, or an interface one issue changes and the other consumes. Draft a prerequisite edge.
  • Coordination note: the issues can run in either order but not together, such as two edits to one module's public surface or a shared test environment. Draft an issue comment.
  • Already recorded: the tracker already carries an equivalent prerequisite or comment. Propose nothing.
  • Stale: either issue is closed or merged, or the evidence no longer holds. Propose nothing for the tracker, and list it so the edge is marked resolved in the Working Ledger.

When the evidence is only a guess from issue titles, say so and prefer a coordination note to a prerequisite edge.

Draft minimal proposals

Keep each proposal as small as the evidence allows:

  • Prerequisite edge: name the issue that waits, the issue it requires, and one sentence of evidence. Propose only the direct edge, never one the tracker already implies through another prerequisite. Before proposing it, check that it would not form a cycle with the prerequisites the tracker already records, and flag an edge that would hold back an issue that is already running.
  • Issue comment: name the issue to comment on and give the exact comment text, ready to post: the other issue, what both touch, and the order you suggest. Draft one comment per edge, on the issue that has not started; when neither has started, on the one later in the owner's Ready order.

Present the proposals

Present the proposals grouped as above, in the owner's Ready order, with "None" under an empty group. Give each proposal as the exact change for the Operator to make, so the Operator can approve and apply each one separately. Approval of one proposal is not approval of the others, and an approved proposal is still the Operator's to apply.

End with a one-line summary: edges reviewed, proposals drafted, and stale edges found.

Check before finishing

  • Does every proposal trace to a Working Ledger edge and name its evidence?
  • Is every proposed prerequisite direct, new to the tracker, and free of cycles?
  • Did you leave every tracker change to the Operator?