Create core Technical Coordinator automatic packages: coordinator-dispatch and coordinator-communication (v0.17.0) #26

Open
opened 2026-11-25 18:33:08 -05:00 by anodyine · 0 comments
Owner

Parent: #19 Epic: Evolve first-party role skills for Technical Coordinator, Specification Designer, Tester, and Tiered Autonomy

Problem

The Technical Coordinator (General Contractor) (anodyine/relayview#1293, specifically anodyine/relayview#1295 and anodyine/relayview#1296) is a brand-new singleton outer-loop role responsible for cross-task status, semantic parallel wave selection, and scarce resource batching (ml-server, GPUs). Operators need transparent, overridable first-party instructions defining how the Coordinator decides what can safely run in parallel and how it communicates in the Control Tower.

Scope

  • Author coordinator-dispatch (schemaVersion: 1, role: "coordinator", step: "coordination", automatic, with a focused wave-selection.md resource if helpful):
    • Singleton Control Tower role: Operate strictly over Owner Portfolio Read Model, Ready issues, active branch/PR footprints, and Shared Resource & Lease Registry projections; never edit repository code, never run shell commands, and never override hard Owner prerequisites or review policies.
    • Semantic parallel wave selection: Detect implicit contention across Ready and active issues — overlapping files/modules, competing SQLite schema migrations or API minor bumps, shared architectural decisions still in flight, or competing external services — and hold conflicting issues out of the same wave.
    • Resource-affinity batching: Use live resource state (e.g., which model is currently loaded on ml-server, available GPU workers) to batch compatible Ready tasks together and minimize expensive reloads, while reporting honest queue reasons when waiting on held leases.
    • Autopilot Off vs. On discipline: When Autopilot is Off, synthesize portfolio status and propose compatible parallel waves for Operator approval without dispatching; when On, dispatch compatible waves through Owner commands and immediately yield at a safe turn boundary when the Operator pauses Autopilot to converse.
    • Typed Layer C escalation: Emit portfolio_conflict or unique_resource_needed escalations when cross-task semantic conflicts or unmanaged resources require Operator judgment.
  • Author coordinator-communication (schemaVersion: 3, role: "coordinator", step: "coordination", treatment: "communication_context", automatic):
    • Concise Control Tower status reporting for the Operator: running wave summary, resource lease/queue state (ml-server, GPUs), held issues + contention reasons, stalled tasks, and pending Review Packet inbox count.

Acceptance Criteria

  • Both packages pass #20 validation, stay well under package byte caps, and clearly distinguish Coordinator judgment from Owner-enforced leases and dispatch authority.
  • OVERRIDING.md explains how an Operator can customize wave aggressiveness, contention heuristics, or Control Tower reporting tone without touching Owner safety gates.

Ablation Decision

not_required: first-party role instruction packages; comparative wave-selection evaluation is tracked separately on anodyine/relayview#1296.

Documentation Disposition

Expected: updated.

Parent: #19 Epic: Evolve first-party role skills for Technical Coordinator, Specification Designer, Tester, and Tiered Autonomy ## Problem The **Technical Coordinator (General Contractor)** ([`anodyine/relayview#1293`](https://tea.kyle-merritt.com/anodyine/relayview/issues/1293), specifically `anodyine/relayview#1295` and `anodyine/relayview#1296`) is a brand-new singleton outer-loop role responsible for cross-task status, semantic parallel wave selection, and scarce resource batching (`ml-server`, GPUs). Operators need transparent, overridable first-party instructions defining how the Coordinator decides what can safely run in parallel and how it communicates in the Control Tower. ## Scope - Author **`coordinator-dispatch`** (`schemaVersion: 1`, `role: "coordinator"`, `step: "coordination"`, automatic, with a focused `wave-selection.md` resource if helpful): - **Singleton Control Tower role:** Operate strictly over Owner Portfolio Read Model, Ready issues, active branch/PR footprints, and Shared Resource & Lease Registry projections; never edit repository code, never run shell commands, and never override hard Owner prerequisites or review policies. - **Semantic parallel wave selection:** Detect *implicit* contention across Ready and active issues — overlapping files/modules, competing SQLite schema migrations or API minor bumps, shared architectural decisions still in flight, or competing external services — and hold conflicting issues out of the same wave. - **Resource-affinity batching:** Use live resource state (e.g., which model is currently loaded on `ml-server`, available GPU workers) to batch compatible Ready tasks together and minimize expensive reloads, while reporting honest queue reasons when waiting on held leases. - **Autopilot `Off` vs. `On` discipline:** When Autopilot is `Off`, synthesize portfolio status and propose compatible parallel waves for Operator approval without dispatching; when `On`, dispatch compatible waves through Owner commands and immediately yield at a safe turn boundary when the Operator pauses Autopilot to converse. - **Typed Layer C escalation:** Emit `portfolio_conflict` or `unique_resource_needed` escalations when cross-task semantic conflicts or unmanaged resources require Operator judgment. - Author **`coordinator-communication`** (`schemaVersion: 3`, `role: "coordinator"`, `step: "coordination"`, `treatment: "communication_context"`, automatic): - Concise Control Tower status reporting for the Operator: running wave summary, resource lease/queue state (`ml-server`, GPUs), held issues + contention reasons, stalled tasks, and pending Review Packet inbox count. ## Acceptance Criteria - Both packages pass #20 validation, stay well under package byte caps, and clearly distinguish Coordinator judgment from Owner-enforced leases and dispatch authority. - `OVERRIDING.md` explains how an Operator can customize wave aggressiveness, contention heuristics, or Control Tower reporting tone without touching Owner safety gates. ## Ablation Decision `not_required`: first-party role instruction packages; comparative wave-selection evaluation is tracked separately on `anodyine/relayview#1296`. ## Documentation Disposition Expected: `updated`.
anodyine added the status/ready-for-agenttype/featurearea/docsarea/agent-workflow labels 2026-11-25 18:33:08 -05:00
anodyine added this to the Issue Status Board project 2026-11-25 18:33:36 -05:00
anodyine moved this to Ready in Issue Status Board on 2026-11-25 18:33:36 -05:00
anodyine moved this to Waiting on Prerequisites in Issue Status Board on 2026-11-25 18:41:22 -05:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: anodyine/relayview-skills#26