Update Implementer packages for tight-loop fast-check convergence and indirect escalation via Planner (v0.16.0) #25

Open
opened 2026-11-25 18:32:26 -05:00 by anodyine · 0 comments
Owner

Parent: #19 Epic: Evolve first-party role skills for Technical Coordinator, Specification Designer, Tester, and Tiered Autonomy

Problem

Implementers currently have no explicit skill guidance on converging fast local checks before sealing a candidate for the Building Inspector (anodyine/relayview#1285), or on routing uncertainty/scope flags through the Planner rather than interrupting the Operator directly (anodyine/relayview#1289).

Scope

  • Update implementer-handoff (and its handoff.md resource):
    • Emphasize tight inner-loop convergence: run fast deterministic checks (types, lint, static analysis, unit/integration tests — seconds, not minutes) and resolve Planner feedback cleanly before sealing a candidate for expensive Tester/Building Inspector verification.
    • Document the indirect escalation rule: when hitting genuine spec ambiguity, an unexpected sensitive boundary, or scope creep, emit structured needs_operator_decision or scope_exceeded flags to the Planner rather than trying to page the Operator directly or silently improvising behavior.
    • Record declared test-resource readiness and any known gaps honestly in the candidate handoff report.
  • Update implementer-communication (schemaVersion: 3, communication_context) for crisp inner-loop handoffs and uncertainty flag framing.

Acceptance Criteria

  • Updated packages pass manifest/digest/size checks and cleanly separate prose advice from Owner report/validation schemas.
  • Ready to tag and verify as v0.16.0 alongside #24 for anodyine/relayview Epic B (anodyine/relayview#1287).

Ablation Decision

not_required: instruction alignment with accepted inner-loop and escalation boundaries.

Documentation Disposition

Expected: updated.

Parent: #19 Epic: Evolve first-party role skills for Technical Coordinator, Specification Designer, Tester, and Tiered Autonomy ## Problem Implementers currently have no explicit skill guidance on converging fast local checks before sealing a candidate for the Building Inspector ([`anodyine/relayview#1285`](https://tea.kyle-merritt.com/anodyine/relayview/issues/1285)), or on routing uncertainty/scope flags through the Planner rather than interrupting the Operator directly (`anodyine/relayview#1289`). ## Scope - Update **`implementer-handoff`** (and its `handoff.md` resource): - Emphasize **tight inner-loop convergence**: run fast deterministic checks (types, lint, static analysis, unit/integration tests — seconds, not minutes) and resolve Planner feedback cleanly before sealing a candidate for expensive Tester/Building Inspector verification. - Document the **indirect escalation rule**: when hitting genuine spec ambiguity, an unexpected sensitive boundary, or scope creep, emit structured `needs_operator_decision` or `scope_exceeded` flags to the Planner rather than trying to page the Operator directly or silently improvising behavior. - Record declared test-resource readiness and any known gaps honestly in the candidate handoff report. - Update **`implementer-communication`** (`schemaVersion: 3`, `communication_context`) for crisp inner-loop handoffs and uncertainty flag framing. ## Acceptance Criteria - Updated packages pass manifest/digest/size checks and cleanly separate prose advice from Owner report/validation schemas. - Ready to tag and verify as `v0.16.0` alongside #24 for `anodyine/relayview` Epic B (`anodyine/relayview#1287`). ## Ablation Decision `not_required`: instruction alignment with accepted inner-loop and escalation boundaries. ## Documentation Disposition Expected: `updated`.
anodyine added the status/ready-for-agenttype/featurearea/docsarea/agent-workflow labels 2026-11-25 18:32:26 -05:00
anodyine added this to the Issue Status Board project 2026-11-25 18:32:54 -05:00
anodyine moved this to Ready in Issue Status Board on 2026-11-25 18:32:54 -05:00
anodyine moved this to Waiting on Prerequisites in Issue Status Board on 2026-11-25 18:41:05 -05:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: anodyine/relayview-skills#25