Commit Graph
4 Commits
Author SHA1 Message Date
adminandClaude Opus 5.5 7c89205e06 Update Planner and Reviewer packages for proof translation, typed escalation, and guardrails (v0.16.0)
planner-scope (schema 2, issueClaim unchanged) now translates the
Specification Designer's requested proof, fast-test completeness, and
declared test resources into Implementer fast checks and Building
Inspector verification goals in Plan v1. A new escalation.md resolves
Implementer needs_operator_decision and scope_exceeded flags inside the
approved specification or promotes them, and escalates directly with one
typed Layer C reason and a short risk summary, never downgrading
operator_review_required.

code-review-auto and code-review share a Trust Pyramid "Propose a
guardrail" section (architecture/API boundary, then static check or fast
regression test, then verification harness, then a candidate prose skill
as last resort) and a typed "Escalate" section. planner-communication and
reviewer-communication (schema 3) frame escalations and Review Packets.

RELEASE-NOTES.md gives each package's before and after for fork
maintainers; OVERRIDING.md and README.md record the new versions and seams.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-25 20:41:06 -05:00
admin c103def91b Move Planner direct-address presentation into communication package
Check instruction packages / check (push) Successful in 11s
2026-11-17 09:01:15 -05:00
admin a8462b52ae Release Operator role wording in instruction packages
Check instruction packages / check (push) Successful in 4s
Check instruction packages / check (pull_request) Successful in 4s
2026-11-14 14:32:27 -05:00
admin dd7b9c9d0b Extract role communication style with explicit ablation metadata
Check instruction packages / check (push) Successful in 6s
Check instruction packages / check (pull_request) Successful in 4s
2026-11-14 07:30:26 -05:00