Extend planner scope with replaceable checklist and presentation
Check instruction packages / check (push) Failing after 2s
Check instruction packages / check (push) Failing after 2s
This commit is contained in:
1 parent
b4666bbda1
commit
f42eba659d
6 files changed
+69
-8
No files matched your search
@@ -3,7 +3,7 @@ name: planner-scope
|
||||
description: Check assigned issue scope, neighboring work, and verification before drafting a Plan.
|
||||
metadata:
|
||||
relayview-display-name: Planner scope
|
||||
relayview-version: 0.2.0
|
||||
relayview-version: 0.8.0
|
||||
---
|
||||
|
||||
# Planner scope
|
||||
@@ -13,3 +13,5 @@ When drafting the assigned Plan, identify the requested behavior, its boundary,
|
||||
If the owner supplies an admitted work-item identity, use the assigned read tools to inspect it. Preserve source attribution; an issue description is a request, not evidence that its proposed behavior exists. Where tracker access is unavailable, state the missing context instead of guessing a work-item identity.
|
||||
|
||||
Write the Plan through the owner's assigned planning interface. The Plan is ready when each requested outcome has an implementation boundary and a checkable success or recovery observation. Owner-controlled workflow stages and checks determine execution authority.
|
||||
|
||||
For a linked Gitea issue, this package declares the owner's transition from `status/ready-for-agent` to `status/in-progress` after it proves that the exact Plan reached the Implementer. Finalize the Plan through the assigned interface, then use owner-reported handoff and issue-claim outcomes when explaining progress to the Operator. An accepted Plan alone does not establish that claim. A user may replace this skill with a Planner fork whose package declares a different target status or disables the claim; follow the selected package's policy recorded for the task.
|
||||
@@ -1,19 +1,22 @@
|
||||
{
|
||||
"schemaVersion": 1,
|
||||
"schemaVersion": 2,
|
||||
"source": {
|
||||
"kind": "first-party",
|
||||
"reference": "v0.2.0"
|
||||
"reference": "v0.8.0"
|
||||
},
|
||||
"role": "planner",
|
||||
"step": "planning",
|
||||
"issueClaim": {
|
||||
"statusLabel": "status/in-progress"
|
||||
},
|
||||
"files": [
|
||||
{
|
||||
"path": "SKILL.md",
|
||||
"sha256": "31399ba322d8a4d3ed9814e7fd5d54883b4773c5b7dc3a241b8e14f8f7c16072"
|
||||
"sha256": "7dbd2ace7472a75c69b70ea118333429dfc7d56e5374454724805aa783cc0112"
|
||||
},
|
||||
{
|
||||
"path": "scope.md",
|
||||
"sha256": "fc365d5f5c90f878992204235f32b1148aa4934a31f8c10eb063292fb64cf248"
|
||||
"sha256": "abed1a1590273b5f62f1e1f47ba8c92d00693de72c0d5e9b014ed1c911ac0a8e"
|
||||
}
|
||||
]
|
||||
}
|
||||
@@ -6,3 +6,38 @@
|
||||
- Distinguish verified current behavior from a proposal.
|
||||
- Identify one observable success path and one meaningful failure or recovery path.
|
||||
- Record uncertainty as an open decision; do not turn silence into approval.
|
||||
|
||||
Focus on:
|
||||
- affected files and symbols
|
||||
- existing patterns and architecture
|
||||
- invariants and edge cases
|
||||
- ordering and dependencies between changes
|
||||
- tests, validation, and likely failure modes
|
||||
- any assumptions that the implementer must know
|
||||
- explicitly authorized supporting context that influences behavior
|
||||
|
||||
Return a compact structured plan. Prefer YAML-compatible Markdown:
|
||||
|
||||
```yaml
|
||||
objective: ...
|
||||
constraints:
|
||||
- ...
|
||||
steps:
|
||||
- id: ...
|
||||
files:
|
||||
- ...
|
||||
symbols:
|
||||
- ...
|
||||
change: ...
|
||||
requirements:
|
||||
- ...
|
||||
depends_on:
|
||||
- ...
|
||||
edge_cases:
|
||||
- ...
|
||||
validation:
|
||||
- ...
|
||||
open_questions:
|
||||
- ...
|
||||
```
|
||||
|
||||
Reference in new issue
Block a user