Define the public claims, site structure, and simulated demo story #3
Notifications
Due Date
No due date set.
Blocks
#2 Epic: Launch the public RelayView site and simulated workflow demo
anodyine/relayview-site
#4 Build the accessible RelayView marketing page
anodyine/relayview-site
#5 Build the scripted interactive RelayView workflow demo
anodyine/relayview-site
Reference: anodyine/relayview-site#3
Reference in new issue
Block a user
Problem
The public site needs approved claims and a coherent visitor path before implementation. RelayView #277 and the superseded #278 hold the original product and marketing requirements.
Scope
Review the current RelayView authoritative product and architecture documents. Draft page sections, calls to action, and a short task-to-review demo script. Mark each product claim as verified current behavior, selected direction, planned artifact/capability, or commercial intent. Specify the simulation label and which screenshots or fixtures may be public. Record that this site is a separate repository with no product implementation source.
The brief must identify the primary audience and the concrete problem of supervising agent work across specialized roles, handoffs, checks, and human acceptance. Preserve “See every handoff.” Define the visitor path through hero, problem, workflow, Community, trust/portability, Teams, integrations, proof, and calls to action. Provide approved copy or specific constraints for each section so #4 does not have to invent product positioning. Where proof or integration evidence is absent, specify a truthful planned or omitted state.
Distinguish a complete, free, proprietary Community product for one human operator, including workplace and commercial-project use, from additive Teams capabilities for multiple people and organizations. Explain that the orchestration engine, prompts, context construction, handoff/correction strategies, routing/ranking, and evaluation-derived mechanisms remain proprietary. Do not call Community open source, open core, a trial, or a limited demonstration.
Describe open trust modules and interoperability contracts as selected direction until exact artifacts ship. Intended trust families are sandbox/process/filesystem confinement; credential custody and bounded authenticated operations; command/network-egress enforcement; and independent audit and artifact-integrity verification. A shipped claim needs links to the exact corresponding source, license, dependencies/toolchain, build instructions, tests and conformance fixtures, policy/interface definitions, artifact-correspondence evidence, compatibility/update rules, operator substitution, supported platforms, and assurance limits. Stable workflow-data/export contracts likewise need versioned specifications and conformance evidence before availability claims.
Define separate Community-adoption and Teams-contact journeys, including the owner, destination, and honest pre-release or unavailable state of each call to action. Do not imply that an unavailable download, Teams service, or public trust repository exists. Exclude unsupported pricing, certifications, uptime, customers, integrations, trademark registration, and security assurances.
Acceptance Criteria
Ablation decision
not_required: site copy and scripted demonstration only.Draft brief in PR: #7 . Private publication and disclosure review: anodyine/relayview#277 (comment) . Documentation disposition: updated. Exact pre-release copy and demo scope await owner approval before issues #4/#5 implement them.
PR #7 now starts the proposed visitor/demo journey with a goal conversation, human-reviewed issue draft, planned issue publication, and selection for implementation planning. The brief distinguishes current planner-led Chat and existing-issue linkage from unshipped issue creation (#353), and labels the simulated publication step. Private disclosure addendum: anodyine/relayview#277 (comment) . Focused claim/link and diff checks passed on commit 1ef8d60; exact teaser copy and eight-stage demo still await owner approval.